Commercial Office Case Study

Commercial-Office-Case-Study.png

Savings

$67,400 in annual savings

The Background

After an HVAC upgrade, our client wanted to ensure that systems were well maintained and operated efficiently. The company originally piloted the Enertiv platform at two sites and have since renewed their subscription as well as expanded projects.

Client Objectives

The focus of the pilot was to enable building operators to become more responsive to operational and maintenance issues across their portfolio. The main objectives were:

  • Improve building operators’ response time to alerts and repairs

  • Identify potential energy savings

  • Quantify equipment performance

  • Optimize equipment schedules

Results

Reduction in maintenance and utility expenses, as well as extending the useful life of equipment, resulted in a payback of less than one year.

 