Thanksgiving Station is a 1M sq ft Class A office campus in Lehi, Utah. As the expectations on the engineering team have increased, they have looked to technology to improve their productivity and the building’s efficiency. This was made more difficult by turnover with the on-site teams.
Read MoreOne California Plaza is an iconic office tower in the downtown Los Angeles submarket. However, the pursuit of sustainability sets off a fierce competition to stay at the forefront of innovation.
Read MoreScott brought Enertiv into three assets with a particular challenge in mind. That was to get the on-site teams to adopt the technology; because if there is no engagement, it’s no use to anybody. The on-site teams have consistently had a 95% compliance score.
Read MoreAt 6:45 pm on Saturday, Enertiv fired a notification that an elevator was idling during a high activity period, an indication that there was an impending issue. The next morning, the elevator actually broke down, proving that the initial alert had been predictive.
Read MoreEnertiv integrated real-time fault detection alerts into NYCHA’s existing work order management system to deliver a 95% reduction in mean time to repair.
Read MoreBy the first quarterly review, maintenance insights were coupled with a series of optimizations that combined to $75,000 in annual savings, a potential 440% return on the first year’s cost of ownership.
Read MoreIn the first month after the initial analysis was provided to the client, elevator entrapment fell 75% and the total amount of time reporter by the maintenance vendor fell 25%, even while preventative maintenance time reported increased nearly 300%.
Read MoreEnertiv used IoT data to quantify maintenance KPIs including mean time tor repair for a prominent real estate portfolio. This data was used to improve workflows and dramatically improve outcomes.
Read More