Carbon Planning Module

Decarbonization plans built to survive budgeting season.

  • Get from portfolio-level pathways to asset-specific plans for priority assets with rapid, low-cost on-site surveys performed by Enertiv on a purpose-built Survey App.
  • AI-powered OpEx and CapEx recommendations built on real-world, up-to-date equipment information.
  • Partner network of manufacturers and installers to go from strategy to action instantly.
Portfolio Properties Dashboards Tickets
D
Carbon Planning
Decarb Projects
34
Across portfolio
Avg. Payback
2.4 yrs
Weighted avg.
CO₂ Reduction
4,280
tCO₂e / yr
CRREM Aligned
82
of 152 properties
Decarbonization Trajectory Interactive
Decarbonization chart
Portfolio Risk · 152 Properties
High Risk
23
$2.4M exposure
Medium Risk
47
Monitor closely
Low Risk
82
On track
82 properties aligned with CRREM
Two different conversations

Pathways unlock capital. Plans get projects approved.

Most platforms generate decarbonization pathways that provide a compelling narrative to investors. That's critical, but only the first step.

To get a project through budgeting season, there has to be an accurate understanding of equipment location, conditions, specifications, and the broader property's business context.

Carbon Pathways

Need to unlock capital and show LPs the scale of decarbonization across your portfolio?

Enertiv's Energy & ESG product generates CRREM-aligned pathways, regulatory risk quantified to the dollar, and LP-ready narratives.

Explore Report →
Carbon Planning

Ready to get projects approved and implemented?

You've unlocked the capital. Now you need plans precise enough to survive a budget review, get asset manager sign-off, and move to implementation.

You're in the right place.
Asset inventory

Low-cost on-site surveys that create a living asset inventory.

Enertiv's field teams conduct rapid on-site surveys that produce a full digital inventory of every piece of equipment in your buildings. Surveys are powered by a purpose-built app with built-in validations to ensure consistent, accurate data at scale.

  • Digital inventory works as a living PCA and can be updated in under a minute as part of the replacement and maintenance process.
  • Using actual equipment condition and specs, Enertiv accurately estimates expected replacement dates.
  • Every piece of equipment is tagged with a QR code, accessible through the Enertiv mobile app for immediate field reference.
Portfolio / Industrial Building 1 / Equipment / A/C-1
A/C-1
Type: Air Conditioning Status: Monitored Managed By: Landlord Condition: Good
Summary Data Work Orders Details Alerts Files
HVAC equipment
Equipment Details Roof / Roof
FunctionHVAC
Equipment TypeAhu
ManufacturerCarrier
Serial #0106G20146
Manufacture DateJan 1, 2002
Expected ReplacementJan 1, 2028
WarrantyWarranty.pdf
Enertiv has been doing this work for over 15 years. We know how to onboard multiple properties simultaneously and do it at a cost that works at scale.
16,296
pieces of equipment digitized on the Enertiv platform to date

Recommended Projects

Portfolio · 34 projects identified · Sorted by ROI

Filters ▾
HVAC High
HVAC System Upgrade
Install high-efficiency HVAC units with smart controls
2026 · 8 months  ·  Payback: 24 months
Linked Insights
Scheduling: TEF-1B - Toilet Exhaust Fan
$659
Scheduling: TEF-6 - Toilet Exhaust Fan
$455
Scheduling: CEF-1 - Corridor Exhaust Fan
$363
Investment
$890K
Annual Savings
520K kgCO₂e
Lighting High
LED Lighting Retrofit
Replace all fluorescent lighting with LED fixtures
2025 · 6 months  ·  Payback: 18 months
Investment
$450K
Annual Savings
285K kgCO₂e
Solar Medium
Geothermal Heating System
Install geothermal heat pump system
2029 · 8 months  ·  Payback: 42 months
Investment
$1.2M
Annual Savings
480K kgCO₂e
Total Projects
34
Total Investment
$8.2M
Avg Payback
2.4 yrs
Project recommendations

Project recommendations asset managers need to approve capital.

Built by engineers, Enertiv fuses utility data, granular equipment data and condition, and platform insights to deliver AI-generated project recommendations with clearly defined capital requirements, expected emissions reductions, and projected payback.

AI is only as good as the data it's built on, and we're proud to say ours is the most complete in the industry.

  • Enertiv's AI generates project recommendations factoring in your budget, investment timeline, decarbonization targets, and regulatory risk exposure across each asset.
  • Use our planning tool to model different scenarios and adjust capital allocation with drag-and-drop. Define the path that fits your strategy before committing a dollar.
End-of-life planning

Plan every end-of-life replacement before it becomes urgent.

When a unit approaches end of life, most teams replace it in kind and move on. Enertiv provides scenario modeling well in advance so no efficiency opportunity gets missed in the process.

  • Enertiv tracks expected replacement dates for every piece of equipment based on actual condition, not generic useful-life tables.
  • As units approach end of life, Enertiv flags electrification and upgrade alternatives with cost and carbon comparisons, so the decision gets made before the procurement order is placed.
RTU-1
Year 0
Equipment installed
Year 10
Equipment condition updated after service
Year 13
Enertiv flags decision point
Scenario modeling triggered ahead of replacement
Year 15 · End of life
Decision point reached
Replace in kind
Heat pump conversion
Electrification recommended with 38% estimated carbon reduction.
Operational efficiency

OpEx and CapEx improvements, in one place.

Enertiv recommends OpEx improvements alongside every capital plan, with OpEx prioritized first because it delivers results faster and at no capital outlay.

  • Scheduling corrections, setpoint adjustments, and run-time controls are identified and recommended for implementation before any retrofit breaks ground.
  • Operational improvements require no capital outlay and deliver results faster than any retrofit project will.
Learn more about Optimize →
Recommended Projects
OpEx No capital · Fast payback
Setpoint Adjustment
Reduce overcooling on floors 4-7 during occupied hours
$14K/yr
No capital
CapEx Scoped against optimized baseline
HVAC Upgrade — RTU Replacement
RTU replacement · 21% ROI
$890K
Year 2026
Solar PV Installation
220kW rooftop array · 18% ROI
$540K
Year 2026
Recommended
28K in annual savings.
Scheduling adjustments via BMS controls can cut consumption by up to 15%.
Partner execution

Execute projects through a vetted partner network.

Approved projects shouldn't require a separate procurement process. Enertiv connects your capital plan directly to implementation partners across everything institutional portfolios need.

Get competitive bids from vetted partners
Special pricing for Enertiv clients
Track project delivery in the same platform that generated the plan
Approved Project

HVAC System Replacement

789 Fifth Ave · Heat pump conversion replacing 4 RTUs at end of life. Approved capital: $890K.

Approved Budget
$890,000
Annual Savings
$186,000
CO₂ Avoided
142 tons/yr
Status
Awaiting bid
Competing Bids 2 vetted partners
Northern Energy Group
Vetted partner · Standard pricing
Est. Completion
Sep 28, 2026
Warranty
7 years
Past projects
12 with Enertiv
Total bid
$874K

The full Enertiv platform.

Reporting Platform

Built to unlock capital.

  • 100% data coverage guaranteed
  • Investor-grade reporting and decarbonization planning
  • Utility data monetization to generate ROI
Property-Level Solutions

Built to deliver results.

  • Enhanced decarbonization plans via on-site surveys
  • Equipment optimization via real-time energy monitoring

Wherever you are on the journey, Enertiv is built to take you further.

For more than 15 years, we’ve helped owners & operators get the data they need, unlock asset value, maximize NOI, and accelerate decarbonization.